Systems engineering for the grid edge
NERC CIP compliance, IEEE 1547 interconnection, reliability engineering, and substation commissioning for grid and power systems.
From concept to COD in one platform
New energy projects are seeded with the 7-phase lifecycle — from Concept through Interconnect, Design, Reliability, Build, Commissioning, and Operations. 40 readiness criteria cover NERC TPL/CIP, IEEE 1547 interconnection, IEEE 693 seismic, and IEEE 80 grounding.
Everything projects in your industry actually need
Stage Gates Out-of-the-box
40 readiness criteria auto-seeded on every new project. No blank-page starts.
Native MBSE Stencils
SysML palette with 12 blocks specific to your domain — drop and go.
Project-type Templates
13 archetypes pre-configured so you start from the right place.
AI-assisted, Domain-aware
Our AI advisor knows NERC CIP / IEEE 1547 — not generic SE. Prompts, references, and deliverables frame themselves correctly.
Project archetypes we support
Your first industry pack is free.
Every subscription includes one vertical pack at no extra cost. Add Energy / Grid today — $0 for your first pack, forever.